618165 - Framework Agreement on Electrotechnical Consultancy Services Tender

The deadline for applying for prequalification for the project has been exceeded.

Description

The Framework Agreement comprises technical advice and consultancy services to BeGreen in relation to development, installation and operation and maintenance of (combined or individual) Renewable Energy Plants (“REP”, solar PV or wind) and Battery Energy Storage System (“BESS”) facilities within the area of Grid Connection Compliance Studies.

The task is to perform the steps necessary to obtain grid connection approval by the DSO/TSO under the current regulation and as described above, as well as to provide all necessary technical support, attend meetings with stakeholders, and prepare documentation to obtain the different operational notifications (EON, ION and FON) at plant level.

The framework agreement may also be used for other energy projects for BeGreen within the specified services.

BeGreen plans to develop and operate multiple utility-scale combined or stand-alone REP and BESS over the next years.

Services included in the Framework Agreement includes amongst others:

  • Technical Regulation 3.2.7: Requirements for voltage quality for generation facility connections to the transmission grid
  • NC RfG - National requirements
  • Appendix A - Information exchange
  • Appendix B - Simulation models
  • Technical Regulation 3.3.1 Requirements for energy storage facilities
  • Technical Regulation 3.1.1 – Requirements for co-located and/or overplanted facilities connected to the transmission grid

Tender procedure

Negotiated procedure

The contracting entity / Contact details

BeGreen A/S
Koldinghus Alle 1 C
4690 Haslev
Note stated for this project

Documents

0
No publicly accessible documents have been added

Disciplines

  • Electrical services
  • Energy-management services
  • Advisory and consultative engineering services
  • Engineering design services
  • Electrical power systems design services
  • Technical services